Blok Systems · Factory-built compute

Heat is
the asset.

Factory-built compute infrastructure that towns welcome and factories plug into.

Qualify your siteSCROLL TO DESCEND ↓
CLAD MODULE · READS AS A BUILDING, NOT A BOX
PAVEMENT2–3 IN
Pavement layer

Your parking lot is the radiator.

IT return water at 85–100°F feeds PEX loops in the slab. The lot stays black through the storm; heat rejection is re-priced as a premium feature.

SLAB LOOPS · 2–3 IN · 34°F IDLE
MELT RATE · 80–125 BTU/HR·FT²
500 kW MODULE ≈ 15,000 FT² SNOW-FREE
Horizontal exchange field

Their process load is our dry cooler.

A mid-depth header layer moves heat sideways. Where a factory sits next door, an insulated main crosses the property line and the heat becomes revenue.

HORIZONTAL EXCHANGE · 6 FT · 58°F
THERMAL EXPORT → 92°F
BTU METER AT PROPERTY LINE · COP 4–6
FACTORY
150 FT · 55°F320 FT · 53°F480 FT · 52°F
Vertical borefield

The ground is the chiller.

300–500 ft bores reach a 45–55°F sink that holds year-round — silent, invisible, water-free. No chillers anywhere in the system. PUE 1.03–1.08.

BORE 214 · 480 FT · 52°F
50-YR BOREFIELD LIFE · 3–4 COMPUTE GENERATIONS
Bedrock · the thesis

The datacenter stops rejecting heat.
It becomes a thermal utility.

Every Blok site treats heat as an asset — routed to geothermal fields, stored in ice, melting snow, sold to the factory next door.

Proof points · measured, not marketed
1.05 PUE
Geothermal sites
90 DAY
Factory build cycle
0 GAL
Water consumed
45 dBA
At 50 ft
50 YR
Borefield life
Product family

Modules that ship commissioned, not as a kit.

Each SKU is factory-integrated, load-bank tested, and set by crane in a week.

SKU 01

IT Module — Air

CPU · Edge · Network
Density10–20 kW/rack
CoolingDX + economizer
SKU 02

IT Module — Liquid

GPU inference
Density80–130+ kW/rack
CoolingDirect-to-chip CDU
SKU 03

Power Skid

Switchgear · UPS · ATS
StorageUL 9540A Li
InterfaceGenerator ATS
SKU 04

Ice Bank

Thermal ride-through
Density10× chilled water
ChargeNight kWh
SKU 05

Thermal Battery

Hot-water / sand bed
MediaStratified
RoleTime-shift heat
SKU 06

Thermal Site Package

Geothermal + snowmelt
Bores300–500 ft
Life50+ yr
The thermal ecosystem

Four ways heat stops being waste.

Closed-loop geothermal

Bores reach a 45–55°F sink that holds year-round.

PUE 1.03–1.08 · WATER-FREE

Snowmelt field

IT return water melts the lot; winter recovers the borefield.

80–125 BTU/HR·FT²

Factory symbiosis

Insulated main crosses the property line; heat becomes revenue.

92°F EXPORT · COP 4–6

Ice storage

Cooling made at night prices, spent at day prices.

10× DENSER · RIDE-THROUGH
The dispatch controller

One brain routes heat against price and weather.

Every thermal and electrical asset optimized in real time. Factory export earns first; the dry cooler only trims.

Dispatch · Site 0847 · Demo
Inputs
Ambient31°F
Day-ahead$0.14/kWh
Precip 6h68%
Ice SoC
IT load
1Factory export92°F
2Snowmelt slab34°F
3Heat reuse / greenhouse88°F
4Borefield (baseline)52°F
5Dry cooler (trim)
HEAT-PRICED COMPUTE · DEFERRABLE JOBS DISCOUNTED WHEN THEIR HEAT LANDS IN HIGH-VALUE WINDOWS
Qualify your site

We permit it. We build it. We answer the phone at 2am.

Feasibility scoring on power, fiber, zoning, noise setbacks, geology, and heat offtake. Instant SKU implication. Response within 48 hours.

Site surveyNO. 0848
SITE LOGGED · GRADE 0.0 FTPOWER INBORES · 480 FTHEAT EXPORT → 92°F
STEP 1 / 5 · LOCATION
Scored within 48 hours. No spam — we respond to qualified sites directly.